Descripción
The Arizona Corporation Commission requires electric utilities to conduct a cost/benefit analysis to compare the cost of line extension with the cost of installing of a stand-alone photovoltaic (PV) system for remote locations with electricity needs. This ruling applies to Arizona Public Service (APS), Tucson Electric Power (TEP), Arizona Electric Power Cooperative, and Navopache Electric Cooperative.
Valoraciones
No hay valoraciones aún.